I called the Heating plus Air Conditioning supplier and I told them that their Heating plus Air Conditioning tech had finally arrived
I was told that my Heating plus Air Conditioning serviceman would be at my house by 8 in the morning. I took off work Last yearbecause they also told myself and others that I had a several hour window and he would be at my house between 8 AM and noon. It was 2 PM and I still had not seen hide nor hair of the Heating plus Air Conditioning serviceman. I called the Heating plus Air Conditioning supplier and I told them that I had been waiting for five hours and I was tired of waiting. I had things that needed to be done. I was told that if I were to leave and the Heating plus Air Conditioning serviceman was to arrive, I would be charged for a repair call and my gas furnace would still be unran tests on. I would have to call and make another appointment to have my gas furnace repair done before winter. I could almost hear the laughter in the man’s voice. I was so angry because I felt like they were wasting my time and I slammed the PC down. At 5 PM, the Heating plus Air Conditioning serviceman knocked at my door. He told myself and others he was there to take care of the gas furnace. I was furious and I ripped into him about being so late. He told myself and others he wasn’t late and he was told to get here as soon as possible. I legitimately didn’t want to him to touch my gas furnace, but I had to have the inspections done. I called the Heating plus Air Conditioning supplier and I told them that their Heating plus Air Conditioning tech had finally arrived. The man apologized for needing to send someone so late. The original serviceman had walked out on the task and they sent this Heating plus Air Conditioning tech at the last moment.